ITP UT

 



INSPECTION AND TEST PLAN

This is a sample Inspection and Test Plan (ITP) Document

All ITP Documents are individual and custom-made for each job

QUALITY PLAN:                                    SAMPLE

PRODUCT DESCRIPTION:                    SAMPLE

CUSTOMER PO:                                   0000000

SHOP ORDER NO.:                              0000000

DRAWING NO:                                      0000000

REFERENCE:                                       0000000

WMP

ACCCREITPTEARINACE

DESCRIPTION

ITNEO.M

R

PRuercqhuairseemerndtser

Material Receipt and Release for Manufacturing -   gCroamdeplivaenricfiecaotfioalnl,Mmilel cTheasnticRaelpporrotspeartnidesDrandwicnhgeRmeicqaulirceommepnotss,itinocnluding -

1

H

DP-2000 Rev 2

Material Identification -   Transfer of all material identification and heat numbers to production documentation -   PMI Verification

2

R

 

Production Schedule -   Ensure all drawings are the latest approved revisions issued -   Fabrication Schedule for Shop is issued

3

R VER R VER

Attached to Shop Orders Dimensional Tolerances match Drawings Dimensional Tolerances match Drawings

Fabrication -   Welding Procedures available for all welding operations -   Assembly -   Lifting Lug

34

 

 


 

H

Weld Prep, MPP-1 Rev 0

Fabrication (Continued) -   Magnetic Particle Testing of Lifting Lug

 

H

Compliance with order and drawing requirements, dimensions and tolerances match Inspection Report to be filled out and recorded

Final Inspection -   Final inspection of all Assembled Items, Loose parts -   Confirm Tagging of Items are complete -   Confirm of Flow indicators is on Units -   Confirm that Heat Numbers and Welders ID have been transferred to Weld Map

5

H

Export Procedure

Shipping -   Items packed to ensure minimal transport damage -   Confirm shipping preparations -   Confirm required stenciling / markings -   Inspection Release Certificate -     Shipping Control Number

6

H

Completeness of documentation Inspector to sign-off

Document Review -   tArlalndsomciusmsieonntstorecvuisetwoemderor completeness and suitability for onward -   MTRs must have purchase order number and line item number on face of each MTR

7

 

 

I certify that the above steps are complete and that the finished product conforms to the specified requirements:

Quality Control Manager:M-AZHDARY

Legend:

H – HOLD POINT                        W – WITNESS POINT           R – RANDOM INSPECTION              VER - VERIFY

 

 

 

 

 

Fig1. Diagrams of control of the butt joints by inclined transducers: a- at thickness of 60 mm and more irrespective of the presence of weld reinforcement; b- at thickness of less than 60 mm irrespective of the presence of weld reinforcement; c- at thickness up to 100 mm with restricted access; d-at restricted excess irrespective of the thickness.

 

 

          4.1.2    The butt joints with removed reinforcement of the weld are controlled

 

 

Table 1

 

Thickness of the Welded joint

Frequency (MHz)

Input angle at control (deg)

by direct reflected beam

By once beam

From 5.5 to 9 inclusive

4-6

70+5

70 +5

Over S to 12 inclusive

4-6

65+5

65 +5

Over 12 to 20 inclusive

2.5-5

65+5

65 +5

Over 20 to 40 inclusive

2.5-4

65+5

45+5

Over 40 to 60 inclusive

1.8-4

65+5

45+5

Over 60 to 100 inclusive

1.8-2.5

60+5; 45+5

Not permissible

Over 100 to 200 inclusive

1.25-2.25

60+5; 45+5

Ditto

Over 200

1.25-2.25

60+5; 45 +5

Ditto

 

 